返回首页
当前位置: home page > Political news >

Media for the first time a comprehensive interpretation of t

时间:2017-10-23 00:40来源:未知 作者:Understanding China 点击:
Since April 1 this year, the establishment of a new area since the announcement of the news, Xiong has been the focus of public opinion chase. More than six months, despite the relevant planning has not yet been disclosed, but with the ste
中新社发 周国强 摄

Since April 1 this year, the establishment of a new area since the announcement of the news, Xiong has been the focus of public opinion chase. More than six months, despite the relevant planning has not yet been disclosed, but with the steady progress of the work, the overall outline of the new area is increasingly clear.
 
According to the central deployment, by 2020, the new area of ​​the external backbone of the traffic network will be basically completed, the starting area of ​​infrastructure construction and industrial layout of the basic form, the embryonic shape of the initial show; by 2030, built green low-carbon, information intelligence, Industry, with strong competitiveness and influence, harmony between man and nature modern city.
 
By then, Xiong An new area will become a beautiful environment, convenient transportation, advanced facilities, desirable long-term livable city. At the same time, through the reform of household registration, housing, education, medical and other fields, the new district will also be attractive to young people: wage income is not low, the cost of living is not high, but also enjoy the quality of public services.
 
China News Agency sent Zhou Guoqiang photo in the new agency sent Zhou Guoqiang photo
The city of ecology
 
Xiong'an District, located in Xiongxian County, Rongcheng, Anxin three counties, a very important consideration is Baiyangdian.
 
In the generally arid and dry North China Plain, with more than 200 square kilometers of waters Baiyangdian, is extremely scarce ecological resources. This piece of natural wetlands known as the kidney of North China. New area covers the whole waters of Baiyangdian, in a sense, the new area is due to starch and students.
 
February 23 this year, the CPC Central Committee General Secretary Xi Jinping in the field study Xiong'an New District construction planning, made a special trip to Baiyangdian. He said: "When I was a child reading Zhang Ga's story, it is very fascinating here." During the course of the study, he repeatedly stressed that the construction of Xiong'an District, Baiyangdai must be repaired and protected.
 
In this regard, the same day accompanied by Xi Jinping Xiong'an New District Party Committee Deputy Secretary, executive director Liu Baoling impressed. According to his memories, Xi Jinping said the new election here, because there are Baiyangdian. The new area due to the forest was born, must not be due to the city of waste lake, "you must not go before the first pollution control of the old road, otherwise we will fail." Xi Xiaping said.
 
May 27, 2016, the CPC Central Committee Political Bureau decided to set up Xiong'an New Area, in order to highlight the protection of Baiyangdian, in the male security area outside the overall planning, specifically launched the Baiyangdian ecological environment management and protection planning, and the planning Placed in the same important position as the overall planning, must be finally submitted to the CPC Central Committee, the State Council for consideration.
 
According to Baiyangdian where the county committee secretary Yang Baochang recalled, around April 1 this year, the central ministries have sent 11 research groups to Hebei research. "9 of them went to Baiyangdian, the remaining two called me Baoding to report the work, understand the focus is Baiyangdian.
 
In June this year, the Beijing-Tianjin-Hebei Association for the development of expert advisory committee leader, honorary chairman of the Chinese Academy of Engineering Xu Kuangdi in the "China City 100 Forum" 2017 meeting revealed that the overall principle of Xiong'an District planning is built, The ecological livable city.
 
"The complex water and land situation in Baiyangdian is a major challenge to the planning of the new district," he said. "It is both a favorable factor and a big problem."
 
Li Jingjiang, former president of the China Urban Planning and Design Institute, said in an interview with "China News Weekly" interview, the history of Baiyangdian water is constantly changing, both flooded and dried , "How to deal with the pattern of the city and the lake, is indeed a difficult problem in planning."
 
Baiyangdian is not a traditional sense of the lake, but a natural wetland. Where the water and reed to criss-crossing, everywhere there are water, there are villages in the lake, there are dike dike, ditch connected. Now there are many villages in the lake, living a lot of villagers. How to deal with these future in the village, but also the planning of the problem.
 
According to Xu Kuangdi revealed that in the course of the discussion, we are very inconsistent with this opinion. Some people think that should be moved out, because the villagers eat and drink Lazard are in the inside of the lake, especially their livelihood now, one is aquaculture, one is engaged in farmhouse, but there is no sewage treatment facilities, are discharged into the lake, to Aquaculture to join the feed, the water will be eutrophication, the best program is all moved out.
 
Another view is that, from a social and scientific point of view, the beautiful countryside is the result of friendly interaction between man and nature in a funky way, and all of them are worthy of fear because they have gone through a natural choice. Xiong'an District can no longer go in the rural areas are moved out, in which the development of the old road, should reshape the era of ecological civilization in China's new urban-rural relations.
 
These thorny problems, the final will be how to solve, but also to be Xiong'an New Area and the overall planning of Baiyangdian ecological environment management and protection plan final program introduced.
 
Prior to the media reports, Baiyangdian ecological environment management and conservation planning of the overall idea will be pollution control, relocation, dredging, island, water and management.
 
Responsible for leading the planning of the Chinese Academy of Sciences Ecological Environment Research Center Qu Jiuhui academicians envisaged the establishment of a three-dimensional monitoring network, through the intelligent management platform for the Baiyangdian atmosphere, water, ecosystems for all-round monitoring and management.
 
Although Baiyangdian final governance program has not yet been announced, the relevant protection work has already begun. According to An Xin county party secretary Yang Baocang introduction, in mid-June to early July this year, Baoding City, the upper reaches of the Baiyangdian Basin has been focused on remediation, focusing on the upper reaches of the river river dredging, and clean up the river within one kilometer of garbage The
 
Liu Baoling said that the new district hopes to carry out the "wash project", so that rural areas as clean as the city. New District has also shut down thousands of "scattered casualties" enterprises, from the source to clear the pollution source of Baiyangdian, so that the concept of ecological priority enjoys popular support.
 
At the same time, the State Environmental Protection Department in July this year, Baiyangdian and Erhai, Danjiangkou together with the "new three lakes" water pollution control, Baiyangdian water pollution control for the first time rose to the national height. This means that Baiyangdian governance in the future will be the country's long-term, stable support.
 
China News Agency sent Zhou Guoqiang photo in the new agency sent Zhou Guoqiang photo
Benchmark city
 
Xiong the future of the building, will strictly follow the current planning is being prepared. In planning the establishment of several important forums in Xiong'an New Area, Xi Jinping repeatedly stressed that "every inch of land planning are clear and start construction", "carefully promote the history of regret."
 
At present, the planning area of ​​the whole new area includes Xiongxian, Rongcheng, Anxin three counties and the surrounding area. Among them, the starting area of ​​about 100 square kilometers, the medium-term development area of ​​about 200 square kilometers, long-term control area of ​​about 2,000 square kilometers.
 
Xiong An New District Planning and Construction Bureau, a responsible person in an interview with "China News Weekly" interview, said the entire planning system can be summarized as "1 +3 +54": "1" refers to the security of the new master plan (Referred to as the "Control Regulations"), and the Baiyangdian Ecological Environment Management and Protection Plan (hereinafter referred to as the "Control Regulations"), the "Control Regulations" Baiyangdian ecological planning "), these four are comprehensive planning;" 54 "refers to 22 special planning and 32 major research.
 
Among them, the "General Regulations" "control regulations" and "control details" by the China Urban Planning and Design Institute (referred to in the regulation of the hospital) is responsible for the preparation of "Baiyangdian ecological planning" is the preparation of the Chinese Academy of Sciences Ecological Environment Research Center. 22 special planning and the preparation of 32 thematic studies, respectively, by different units are responsible, such as the Ministry of Housing and Urban Policy Research Center is responsible for the study of new housing policy.
 
The person in charge told the "China News Weekly", the current four major plans to advance in advance. 22 special programs and 32 thematic studies are aimed at a more detailed planning and research on a particular part of the General Regulation, such as industry, rail transit, and flood control. In layman's terms, it is for the preparation of "general rules" services, provide the basis and materials.
 
Different from the previous urban planning, the Xiong'an District planning work, the central attaches great importance. Not only four comprehensive planning, to report to the CPC Central Committee and State Council for approval, and the central government also commissioned the Beijing-Tianjin-Hebei Association for the development of experts Advisory Committee (referred to as the Advisory Committee) to check the planning.
 
Liu Bing, a member of the expert advisory committee and director of the Institute of Economic and Social Development of Nankai University, said in an interview with China News Weekly that the expert advisory committee was an advisory body established by the central government for the development strategy of Beijing-Tianjin-Hebei. The central government has also issued a red tape, which is rare in our party history.
 
The expert advisory committee is composed of 16 top experts in the relevant fields of the country. The head of the committee is the honorary chairman of the Chinese Academy of Engineering. He is the honorary chairman of the Chinese Academy of Engineering. He has two members, one vice chairman of the Chinese Academy of Engineering, Wu Hequan, and the other is the State Council Development Research Center Director Li Wei.
 
Liu Bing said, the expert advisory committee's main responsibility is to cooperate with the Beijing-Tianjin-Hebei cooperation and development leading group work, directly responsible for the central leadership.
 
Previously, in the process of the selection of Xiong'an New District, the expert advisory committee played an important role, three went to Xiong field research, held a number of demonstration, experienced the whole process of site selection. The expert advisory committee is responsible for planning the plan. "Every time the plan is sent, we will discuss the meeting, one by one to modify." Liu Bingqiu on the "China News Weekly," said, "but we only consult, do not make decisions." Xu Kuang Di chairman to our discipline is only help , Do not add chaos.
 
The role of the expert advisory committee in the planning of the new district is more like a gatekeeper. The aforementioned New District Management Committee Planning and Construction Bureau official told the "China News Weekly", the planning program will eventually be summarized into the expert advisory committee.
 
According to the person in charge, the planning process is called "tempered", has held a number of planning and preparation of special meetings, work conference to study the new district planning.
 
In Anxin County held a forum, Xi Jinping warned that the new security zone must adhere to the "world vision, international standards, Chinese characteristics, high point positioning" concept, and strive to build a new development concept of innovation and development demonstration area. "To adhere to the most advanced concepts and world-class planning and design and construction, can withstand historical test."
 
Xu Kuangdi in the "China City 100 people Forum" 2017 meeting frankly, how to seize the city in the construction of scientific and technological innovation, so that after a hundred years without backward, "the Secretary of the requirements of the experts (advisory) committee pressure."
 
Members of the Advisory Committee, the China Urban Planning and Design Institute of the original president Li Xiaojiang told the "China News Weekly", relative to the general urban planning, Xiong this is almost a white paper on the planning more difficult, "because, all Must start from scratch. "
 
According to the aforementioned New District Management Committee Planning and Construction Bureau, the person in charge of the construction of the new area will use a lot of new ideas, new technologies and new materials.
 
Xu Kuangdi mentioned in a speech before a "breathing the wall", can automatically convert carbon dioxide into oxygen, so that the room oxygen content stability, do not open the window will be able to adjust the air. It is said that this intelligent building, already have a small test. "Xiong is built from scratch, is it should be done early research?" Xu Kuangdi said, "otherwise the new town came out, and then rebuilt on the difficult."
 
Xiong An future goal is to build green wisdom Metro, built a world-class, green, modern, intelligent city. According to a person familiar with the planning revealed that the future of the entire new area of ​​carbon emissions will be close to zero emissions, energy will be mainly to wind power, hydropower and other clean energy-based, driving the car will use new energy technologies.
 
For the wisdom of the city, expert advisory committee vice head, vice president of the Chinese Academy of Engineering Wu Hequan has explained that the so-called wisdom of the city, including traffic, environmental protection, sponge city, innovation city, which is one thing, it will certainly be broadband city, City, internet city.
 
At present, in the security of the planning, has been considered the central city of WiFi coverage, you can do seamless Internet access. In addition, Beijing's fixed-line broadband construction goal is to achieve 100M by 2020, Xiong will not be lower than this goal; Beijing plans to wireless broadband now 4G coverage, Xiong also hope 4G coverage.
 
Wu Hequan also revealed that by 2020, China's 5G to achieve commercial, Xiong is likely to become China's first to use 5G area. Because the local focus on high-end talent, will need more high-end network.
 
In early August this year, Xiong Anxin has reached an agreement with China Telecom, which will be listed as the backbone of the national backbone network, and in advance layout in the new district 5G test network.
 
5G is a basic capability of the smart Internet. For example, in the 5G network, the smart phone can connect the wisdom of the family, UAV, robot or unmanned and so on.
 
China Electronic Society, part-time professor of Beijing University of Posts and Telecommunications, said Mr. Li Zhigang, with these capabilities, all the traditional industries will face a revolutionary change and enhance. Which area will take the lead in change, can not guess, but this change will be comprehensive, revolutionary.
 
In addition to the broadband network, the other infrastructure of the Xiong'an New Area will also become the benchmark for the future of China's cities. August 2015, Tianjin Binhai New Area explosion power disruption, has led to the National Supercomputing Tianjin Center (Tianhe One) shut down more than ten hours. "Xiong An will not happen this." The aforementioned New District Management Committee Planning and Construction Bureau official said, the new district power supply will be very stable, power supply reliability rate will reach 6 "9" standard, similar to the current world The most advanced Singapore power grid.
 
In mid-September this year, 2017 first China Xiong wisdom city construction fair held in Shijiazhuang. The exhibition brings together a large number of domestic and foreign enterprises of new technologies, new design and new products, exhibitors are hoping to build a place in the future construction of a seat.
 
However, Li Xiaojiang in an interview with "China News Weekly" interview, said Xiong used all the technology must be mature, the new area will not become immature technology test field. And for some of the future may appear new technology, planning will also be considered.
 
"Now, for example, we are going to discuss a very warm unmanned logistics system that is not yet mature and we may not be able to apply it right now, but now we have to consider this possibility when we plan the underground corridor Sex, put space out, "he said.
 
In Li Xiaojiang view, Xiong An reason is not an old city on the basis of transformation, but to build a new city, a very important reason is that "for our future urban construction, to provide a new paradigm."
(责任编辑:Understanding China)

顶一下
(0)
0%
踩一下
(0)
0%
------分隔线----------------------------
发表评论
请自觉遵守互联网相关的政策法规,严禁发布色情、暴力、反动的言论。
评价:
推荐内容